Tanaka Electric Tanaka Electric

6.3mva 10kv Arc Furnace Transformer for Melting Scrap Metal Electric Arc Furnace Transformers for Steel Making Furnace and Rectifier Transformers Ville

Customization: Available
Application: Power, Electronic, Instrument, Lighting, Rectifier, Audio, Furnace Transformer
Phase: Three

Product Description

Basic Information
Model NO. HSSP-6300/6
Core Core-type Transformer
Cooling Method Oil-immersed Type Transformer
Winding Type Multi-winding Transformer
Certification ISO9001-2000, ISO9001, CCC
Usage Single-phase, Rectifier, Combined, Power, Distribution, Furnace Transformer
Capacity 6.3mva
Specification IEC CE, ISO
Product Description & Parameters
6.3MVA 10KV Arc Furnace Transformer
Capacity:6.3MVA
Connection Symbol:yd11
Primary Voltage (kV):6
Secondary Voltage (V):207-158
Regulation Voltage Step:5
Short-circuit Impedance (%):7.5
No-load Loss (kw):8.5
On-load Loss (kw):58.2
Total Weight (Ton):19.2

Electric furnace transformers supply power to electric furnaces by dropping high voltage to the required working voltage. Our manufacturing range includes transformers for steel electric furnaces (on-load, no-load, and enclosed reactor) and mineral hot furnace transformers used for smelting iron alloys, hydrosilicons, and carbides.

Detailed Photos
Arc Furnace Transformer Detail
Transformer Component
Internal Structure
Manufacturing & Quality

Our facility combines a Transformer R&D center, production, and after-sales service. We possess strong technical strength and excellent manufacturing equipment. We specialize in large-scale power transformers and industrial transformers of high quality and reliability for iron, steel, and electrometallurgical industries.

Advanced Equipment
Over 500 sets of sophisticated production and test equipment ensuring first-class quality standards.
Global Reach
Products are highly credited in international markets including Southeast Asia, Middle East, and African regions.
Professional Service
Providing full technical solutions, manufacturing supervision, and 12-hour quick response support.
Factory Overview
Production Line
Testing Center
Frequently Asked Questions
What is your typical delivery time for these transformers?
The delivery time depends on the specific type and capacity of the transformer ordered.
What payment terms do you offer?
Normally 30% advance by T/T, and 70% before delivery by T/T or L/C; other terms are negotiable.
Which international standards do your products follow?
We follow major global standards including IEC, ANSI, CSA, and GB.
What kind of documentation is provided with the equipment?
We provide quotations, outline drawings, manufacturing and quality control plans, testing plans, and type test reports (e.g., KEMA, CESI).
How long is the standard warranty period?
The standard warranty is 12 months after the transformer begins operation.
Do you provide on-site installation and commissioning?
Yes, we can dispatch our technical installation team to the user's site for professional service and training.

Related Products