Tanaka Electric Tanaka Electric

Yuanchen IEC60076 Iraq Factory Customized Power Transformer Price 250kVA 500kVA Hermetically Sealed Oi Immersed Three Phase Two Winding Transformer

Customization: Available
Application: Power
Phase: Three

Product Description

Basic Specifications
Model NO.
S-30KVA-2500KVA
Core
Core-type Transformer
Cooling Method
Oil-immersed Type
Winding Type
Two-winding Transformer
Certification
ISO9001, CCC, CE
Usage
Power / Distribution
Frequency
50 Hz / 60 Hz
Winding Material
Copper
Input Voltage
6kv - 35kv
Output Voltage
110V - 480V
Product Overview
Power Transformer Banner
Hermetically sealed oil-immersed three-phase two-winding transformer, customized to IEC60076 standards.
Detailed Transformer View
Main Product Line
Main Product Range
🏢
Professional Manufacturing: We are a leading manufacturer dedicated to the design and production of high-quality power transformers. Our core business includes Distribution Transformers (up to 35kV), Dry-Type Transformers, and Compact Substations.
🛠️
Production Capability: Operating from a modern facility of over 90,000 square meters, we maintain an annual production capacity exceeding 3,000,000 kVA, integrating core processing, coil winding, and vacuum drying.
Facility Overview
Workshop
Manufacturing Excellence
Factory Production
Factory Testing
Quality Certificates
Logistics & Global Presence
Global Exhibition
Export Packaging
Shipping Container

We use sturdy wooden crates with internal securing and moisture-proofing for LCL shipments, and secure fastening for FCL shipments to ensure safe long-distance ocean transport.

Frequently Asked Questions
Does the factory hold international quality certifications?
Yes, our factory is ISO 9001 certified. All products comply with international standards such as IEC (International Electrotechnical Commission) and CE.
What is the annual production capacity?
We operate advanced production lines with an annual capacity exceeding 10,000 units, ranging from 30KVA to 20MVA transformers.
Are the windings made of copper or aluminum?
We offer both. Copper windings provide higher conductivity and efficiency, while aluminum windings offer a lighter, cost-effective alternative.
What is the standard delivery lead time?
Standard small transformers typically take 15-30 days, while large or customized units may require 45-90 days depending on specifications.
What kind of after-sales technical support is provided?
We provide a 12-month warranty, remote technical guidance via video/email, and a long-term stable supply of spare parts.

Related Products